Abstract

The 115kV Electric Transmission line project involved building a 6 mile transmission line between two substations in the greater Manchester, NH area. The new transmission line will allow the electric utility to supply more reliable electric power to the area that includes customers such as Boston-Manchester Regional Airport, Elliot Hospital, and The Mall of NH as well as residential customers in the area. The new transmission line was built in an existing right of way (ROW) which required minimal impact to the environment as well as the land owners that live along the transmission line ROW. This new transmission line will allow additional reliability by allowing the utility to transfer electric load from one area to the other on hot summer days or cold winter days. The capstone portion of the project primarily involved the construction of the electric utility line.

Project Type

Capstone

College or School

College of Professional Studies Granite Division

Program or Major

Project Management

Date

Fall 2016

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.