https://dx.doi.org/10.6073/PASTA/1DBADEFF81BF3E01CE4B188FFC93123F">
 

PIE LTER Year 2015, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA.

Data Repository

Environmental Data Initiative

Publication Date

1-1-2018

Department

Earth Systems Research Center

Description or Abstract

Year 2015, continuous measurements, every 15 minutes were made of conductivity, water temperature in the Parker River behind the head of tide Central St. Dam in Newbury, MA.

Access

Public (open access)

Share

COinS