Beard's Creek Impoundment Drawdown [2018-07-11]
Publisher
Figshare
Document Type
Data Set
Publication Date
1-16-2019
Disciplines
Environmental Monitoring | Environmental Sciences
Description or Abstract
Aerial imagery of the Beard's Creek impoundment drawdown in Durham, NH off of Coe Dr. The drawdown occurred around May 7, 2018, and consisted of removing stop logs from the Route 108 dam to permanently lower the water level in the impoundment by 2 feet. This imagery was collected July 11, 2018, and illustrates how the impoundment area is adjusting from a lentic to lotic environment. Vegetation is establishing throughout the exposed sediments and on the new channel banks compared to the more barren impoundment in the May 30, 2018 imagery seen here: https://figshare.com/articles/Beard_s_Creek_Impoundment_Drawdown_2018-05-30_/6801116. The orthomosaic was created using 252 images collected at 250 ft above ground level using a DJI Phantom 3 Professional small unmanned aerial system. The orthomosaic has a spatial resolution of 3.16 cm/pix. Automated flight paths were executed using the Litchi flight app that provided sufficient and consistent side and frontal overlap between nadir images. Flight paths were planned using DJIFlightPlanner. Sets of angled (20 degrees from nadir) photos were collected with automated flight paths to supplement the nadir images for structure-from-motion photogrammetry. The same flight paths were used to collect this imagery as the May 30 imagery. Images were processed in Agisoft PhotoScan Professional. Imagery was georeferenced using the drone's built in gps (WGS84) and is sufficient for illustrative purposes to overlay with the May 30, 2018 imagery but will not perfectly align. Private residences and yards have been cropped out of the imagery. Thanks to Scott Greenwood, Sonnet Agran-St.Pierre, & Keelin Berger for assisting fieldwork and processing.
The first file (jpg) is a screenshot to provide a preview on figshare. The second file (tif) is the full resolution, georeferenced orthomosaic.
DOI
https://doi.org/10.6084/m9.figshare.6818312.v2
Grant/Award Number and Agency
This orthomosaic was made using resources from an NSF EPSCoR funded project titled “RII Track-2 FEC: Strengthening the scientific basis for decision-making about dams: Multi-scale, coupled-systems research on ecological, social, and economic trade-offs”. Support for this project is provided by the National Science Foundation's Research Infrastructure Improvement NSF #IIA-1539071. Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author(s) and do not necessarily reflect the views of the National Science Foundation.
Access
Public (open access)
Rights
CC BY 4.0
Recommended Citation
Evans, Alexandra; Gardner, Kevin (2019): Beard's Creek Impoundment Drawdown [2018-07-11]. figshare. Dataset. https://doi.org/10.6084/m9.figshare.6818312.v2