PIE LTER Year 2014, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA.
Data Repository
Environmental Data Initiative
Publication Date
1-1-2018
Department
Earth Systems Research Center
Description or Abstract
Year 2014, continuous measurements, every 15 minutes were made of conductivity, water temperature in the Parker River behind the head of tide Central St. Dam in Newbury, MA.
Access
Public (open access)
Recommended Citation
Wollheim, Wilfred and Green, Mark, "PIE LTER Year 2014, 15 minute measurements of conductivity, water temperature at the Parker River head of tide, Central St. Dam in Newbury, MA." (2018). Data Catalog. 107.
https://scholars.unh.edu/data_series/107